The folder at completion
Everything the building has had to prove, in one place.
At completion the evidence stops being a set of site visits and becomes a pack of
certificates and reports. This is its shape — the tabs a building collects as it goes.
- AAir tightness test certificatePart L · UKAS 2731
- BSound insulation test reportPart E
- CVentilation test reportPart F
- DThermographic survey reportFabric
- EPart L photographic evidenceAs-built
- FRoom integrity test reportGaseous systems
- GSmoke shaft vent test reportSmoke control
- HSAP / SBEM as-built & EPCEnergy
- ICompliance PackDigital handover
Indicative contents — the scope of a handover pack is agreed project by project.